January 12, 2026

Students at Ottawa High School are starting the year without heat in parts of the building. Well, to be fair, they are keeping the building warm, but the boiler on the north side of the building blew out a few days after school broke for Christmas. Superintendent Dr. Ryan Cobbs tells us about the temporary solution:

He adds that it could take up to five weeks to get the new boiler and get it installed. In the meantime, he’s thankful they were able to secure the room heaters for the short term.